The installation
was scheduled for October 2013, over 5 days. The canopy was installed on time with no problems and the school was very happy with the end result.
"The team have been cooperative, worked flexibly with the school, communicated well with us and have been very hard working. We are very happy with the shelter, thank you."
- Sarah Harrison – Assistant Head Teacher
Above: Before Canopy Installation |
![]() Above& Below: After Canopy Installation |
![]() |